The work has included in the first stage familiarization with the site, the original plans, the actual situation, performance and supervision of tests and sampling operations at the site. Later, the data and results of onsite tests had to be analyzed, in order to understand the nature of the problem and to suggest engineering solutions to the problem.
The work was carried out together with a team of experts from the RHDHV Company in the Netherlands. Our responsibility included coordination of all work in Israel, including liaison, obtaining information, translations, selecting an implementing company, oversight of tests and sampling operations conducted in the field and assistance in analyzing the information and understanding the problem. The Dutch experts analyzed the existing engineering information, defined the tests and sampling operations required, the work methodology, analyzed the results in order to better understand the problem, and presented possible engineering solutions to the problem.
Upgrading the Sorek sewage works (Jerusalem West) to work at a flow rate of 110,000...
Preparation of a plan for a reduction of air pollution from the transport sector, combining...
Advising the Ministry of Environmental Protection regarding regulation of plants that require emission permits under...